Adikara, K., & Machfudiyanto, R. A. (2024). Stakeholder Identification and Collaboration Indicators in The Construction of Pedestrian Facilities in Jakarta. Journal La Multiapp, 5(3), 213-221.
https://newinera.com/index.php/JournalLaMultiapp/article/view/1324.
Arbabi, H., Alishahi, S., Sobhiyah, M., & Taheripour, S. (2021). Analyzing stakeholders’ interactions in an urban project with non-level intersection in Urmia using the power and interest matrix and social network analysis. Motaleate Shahri, 10(37), 71-84. doi:
10.34785/J011.2020.361. (In Persian)
Amiri, M., Salehzadeh, S., & Zareian, A. (2010). Presenting the integrated model of stakeholder analysis to rank the macro goals of the case study: Isfahan Municipality Parks and Green Spaces Organization. The fifth international conference on strategic management, Tehran, 7.
https://civilica.com/doc/102983. (In Persian)
Frost, F. (2001). “Generic promotion of dairy products: a stakeholder perspective”, School of marketing. Curtin university of Technology.
Ghansah, F. A., Owusu-Manu, D. G., & Ayarkwa, J. (2021).
Project management processes in the adoption of smart building technologies: a systematic review of constraints.
Smart and Sustainable Built Environment,
10(2), 208-226.
doi.org/10.1108/SASBE-12-2019-0161.
Giordano, R., Pluchinotta, I., Pagano, A., Scrieciu, A., & Nanu, F. (2020). Enhancing nature-based solutions acceptance through stakeholders' engagement in co-benefits identification and trade-offs analysis. Science of the Total Environment, 713, 136552.
doi.org/10.1016/j.scitotenv.2020.136552.
Gregory, A. J., Atkins, J. P., Midgley, G., & Hodgson, A. M. (2020). Stakeholder identification and engagement in problem structuring interventions. European Journal of Operational Research, 283(1), 321-340.
Haixin, W., Houli, F., Zuhe, W. (2015). “The Dynamic Fuzzy Clustering of the Project Stakeholders Demands Information”, The Open Cybernetics & Systemics Journal, 9(1), 747-752. doi.org/
10.2174/1874110X01509010747.
Hojaji, F. (2009). Introducing the stakeholder circular methodology and the application of a practical model for stakeholder management in municipal outsourcing projects. The fifth international project management conference, Tehran, 18.
Hosseini, A., Maroofi, M., Maroofi, A., Habibi, K., & Sharifi, A. (2022). Problematic Urban Textures Planning, an Approach of Stakeholder Analysis and Social Network (Experimental example: Kholazir Jonoubi area in the 19th district of Tehran). Journal of Urban Social Geography, 9(2), 25-46. doi:
10.22103/JUSG.2022.2073. (In Persian)
Kaler, J. (2002), “Morality and strategy in stakeholder identification”, Journal of Business Ethics, 39(2), 91-100. doi.org/10.1023/A:1016336118528.
Kumar, V., Rahman, z., Kazmi, A. A. (2016). "Stakeholder identification and classification: a sustainability marketing perspective", Management Research Review, 39(1), 35 – 61.
Mainardes, E.W., Alves, H. and Raposo, M. (2012). “A model for stakeholder classification and stakeholder relationships”, Management Decision, 50(10), 1861-1879.
Makan, A., Fekadu, A., Murhar, V., Luitel, N., Kathree, T., Ssebunya, J. and Lund, C. (2015),” Stakeholder analysis of the Programme for Improving Mental health carE (PRIME): baseline findings”, International Journal of Mental Health Systems, 9(27), 1-12.
doi.org/10.1186/s13033-015-0020.
Madghalchi, A., Sabiheh, M.H., Reyhani Hamdani, H. (2007). Identifying and Ranking the Dimensions and Components of Educational Estimating the impact of stakeholders in construction projects and providing a method to analyze and manage stakeholders (Case Study: Restoration of Qaisarieh Zanjan Bazaar Project). The third international project management conference, Tehran, 12.
https://civilica.com/doc/15266. (In Persian)
Management of the Shahada Square Grand Project,
Mitchell, R. K., Agle B. R., Wood, D. J. (1997). “Toward a Theory of Stake-holder Identification and Salience: Defining the Principle of Whom and What Really Counts”, Academy of Management Review. 22(4), 853-887. doi.org/10.5465/amr.1997.9711022105.
Mirfakhredini, S.H, Pourhamidi, M, Mirfakhradini, F.S. (2012). Harmful Modes and Effects Classification Using Fuzzy Cluster Analysis Case Study: Steel Making Factory of Iran Alloy Steel Company, Journal of Industrial Management Studies, 10(27), 68-93.
Moghadami, A. (2014). Stakeholder management model in project management according to the PMBOK model. Organization of Documents and National Library of the Islamic Republic of Iran. (In Persian)
Pacheco, C. and Garcia, I. (2012). “A systematic literature review of stakeholder identification methods in requirements elicitation”, Journal of Systems and Software, 85(9), 2171-2181. doi.org/10.1016/j.jss.2012.04.075.
Project Management Institute, (2015). Guide to the scope of project management knowledge.
https://www.pmi.org.
Raum, S. (2018). A framework for integrating systematic stakeholder analysis in ecosystem services research: Stakeholder mapping for forest ecosystem services in the UK. Ecosystem Services, 29, 170-184.
doi.org/10.1016/j.ecoser.2018.01.001.
Reed, S., Graves, A., Dandy, N., Posthumus, H., Hubacek, K., Morris, J., Prell, CH., Quinn, C., Lindsay, C. (2009). “Who’s in and why? A typology of stakeholder analysis methods for naturalresource management”, Journal of Environmental Management, 90(5), 1933–1949.
Rivera-Camino, J. (2007). “Re-evaluating green marketing strategy: a stakeholder perspective”, European Journal of Marketing, 41(11/12), 1328-1358.
doi.org/10.1108/03090560710821206.
Saghafi, F. (2014). Sustainable value creation framework on stakeholder management (case study: native operating system of Iran). Modiriat-e-farda, 39(39), 1.
http://www.modiriyatfarda.ir/Article/139412281746511444. (In Persian)
Salehi, M., Movahedi, M. (2016). Identifying and Ranking the Dimensions and Components of Educational Stakeholder's Role on Implementation of Knowledge Management (Case Study: Mazandaran Province Education), Management tomorrow, 15(48), 161-178.
magiran.com/p1698308. (In Persian)
Mirfakhredini, SH., Pourhamidi, M., & Mirfakhradini, FS. (2013). Harmful Modes and Effects Classification Using Fuzzy Cluster Analysis Case Study: Steel Making Factory of Iran Alloy Steel Company, Journal of Industrial Management Studies, 10(27), 63. magiran.com/p1123761. (In Persian)
Shah Hosseini, V., Rajab Pourkashev, A., Khalili, S., & Amiri, O. (2012). Identification, communication planning and management of stakeholders' expectations in Tehran municipality, based on PMBOK standard, case study: project of multi-purpose crisis management support bases. The third international conference of the construction industry, Tehran, 8.
Thaqafi, F., Abbasi, K., & Kashtkari, E. (2014). Sustainable value creation framework on stakeholder management (case study: native operating system of Iran), Management tomorrow, 13(39), 1-10.
http://www.modiriyatfarda.ir/Article/139412281746511444. (In Persian)
Wu, X. (2007). “Stakeholder identifying and positioning (SIP) models: from Google’s operation in China to general case analysis framework,” Public Relations Review, 33(4). 415-425.
doi.org/10.1016/j.pubrev.2007.08.016.
Yaghini, M., Ranjpour, M., & Yousefi, F. (2009). An overview of fuzzy clustering algorithms. The third data mining conference, Tehran, 13.
https://civilica.com/doc/108990 (In Persian)